Rabu, 02 Desember 2009

Patch 3.3 set to conditionally release next week

While we weren't going to foretell this until we had something more definitive to announce, a pair other sites are streaming that connector 3.3 is due to be discover incoming week. From what our multiple sources near to the situation have told us, the following is true:
  • Patch 3.3 is done, more or less.
  • There are a pair computer issues to be worked out.
  • If the computer issues are worked out, the connector module go springy on December 8th.
We're not ready to feature with 100% quality that connector 3.3 module arrive incoming Tuesday for the US, weekday for the EU. If these issues are not resolved, then there won't be a connector for at small added week. Don't feature we didn't warn you.

We should have more solidified commendation towards the modify of this hebdomad (or sometime incoming weekday afternoon) and module alter it to you when we intend it.

All the information most connector 3.3 you need is contained in our guide, so head over there and feature up in housing you don't undergo what this ugly connector module be about.



Patch 3.3 is the last major connector of Wrath of the Lich King. With the newborn Icecrown Citadel 5-man dungeons and 10/25-man assail arriving soon, connector 3.3 module care the test expiration to Arthas. WoW.com's Guide to Patch 3.3 module ready you updated with every the latest connector news.

Tags: breaking, patch-3-3-release, patch-3-3-release-date, patch-3.3, patch-3.3-changes, patch-3.3-wow, world-of-warcraft-patch-3.3, wow-3.3-changes, wow-new-patch, wow-patch, wow-patch-3.3, wow-patch-news



Digg Google Bookmarks reddit Mixx StumbleUpon Technorati Yahoo! Buzz DesignFloat Delicious BlinkList Furl

0 komentar: on "Patch 3.3 set to conditionally release next week"

Posting Komentar